Quality

Quality Assurance in Steel Detailing

Errors in detailing are expensive in the shop and on site. Our checking process is built to catch them before information is released.

Three levels

Checked Three Times Before It Leaves Us

LEVEL 01

Detailing

Model and drawings created according to approved project standards.

LEVEL 02

Technical Review

Senior detailer reviews model, connections, dimensions and documentation.

LEVEL 03

Final QA/QC

Independent checker validates the deliverables before client submission.

Checklist

What Every Package Is Checked Against

A consistent checklist is applied to each submission so nothing depends on individual memory.

  • Geometry
  • Member sizes
  • Connections
  • Bolts
  • Welds
  • Plates
  • Dimensions
  • Levels
  • Piece marks
  • Drawing references
  • BOM/MTO
  • Revisions
  • Client standards
  • Fabrication outputs

From model to fabrication

Have a Steel Project Coming Up?

Send us your drawings, project requirements and target schedule. Our team will review the scope and get back to you with the next steps.

Request a Quote